exclusively distributed by

SS GEO TECH
SUPPLIES & SERVICES

a unit of
Veluchi Industries, Inc.


Four - Way Method

THE EASY FOUR-WAY METHOD



1. Scarify road surface to the desired depth.

 



2. Apply the diluted Miracore Soil Stabilizer through an
appropriate water carrier.

 

3. Blade mix treated soil and then contour the road to the required finished level.

 

4. Compact using a vibratory compactor, If necessary, spray additional
water to the treated soil while compacting.



MIRACORE STABILIZED ROAD



© Copyright 2002, SS Geo Tech Supplies & Services, All Rights Reserved